Azure21 Windows servers

On-premises servers moved to Azure, with a test run before the real cutover

We built IQEQ's Azure foundation, moved 21 on-premises servers with Azure Migrate, and left monitoring, backup and security switched on.

Talk to our team
Windows servers moved to Azure
21
test failover, then final failover
1 + 1
controls on: monitoring, NSGs, Defender, backup, locks
5
01 · The challenge

21 servers to move, with nothing rebuilt

IQEQ ran 21 Windows Server machines on premises and wanted them in Azure as they were, without rebuilding them. Its domain roles sat in the same place as the servers, and there was no Azure foundation yet to receive them: no network, no naming rules and no backup setup.

On-premises servers21 Windows Server machines still ran on premises.
Domain roles in one placeThe domain controller roles sat alongside the servers being moved.
No Azure foundationThere was no network, naming, tagging or backup setup in Azure yet.
02 · Our approach

Rehearse first, then cut over

  1. 1

    Readiness check

    Confirmed admin access, domain controller health, the migration appliance, server versions and the firewall license.

  2. 2

    Azure foundation

    Built resource groups, a virtual network, DNS, naming and tagging rules, the Azure side of the site-to-site VPN, and an Azure Migrate project.

  3. 3

    Identity

    Added a domain controller in Azure and moved the FSMO roles to it.

  4. 4

    Rehearsal and cutover

    Replicated all 21 servers, ran a full test failover, then the final failover, and fixed issues found along the way.

  5. 5

    Day-to-day controls

    Switched on monitoring, network security groups, Defender for Cloud, backups and resource locks, cleaned up, and handed over step-by-step user guides.

03 · The outcome

Servers in Azure, with controls on from day one

IQEQ's servers now run in Azure with its domain services alongside them, and day-to-day controls were in place from the start. Because the test failover came first, the final cutover followed steps the team had already run once.

  • All 21 servers running in Azure
  • Domain services moved to Azure alongside them
  • Monitoring, backups, Defender and locks switched on
  • Step-by-step guides for the team's daily work
04 · Technology
  • Azure Migrate
  • Azure landing zone
  • Active Directory
  • Azure Backup
  • Defender for Cloud
Cloud Engineering

Your next move to Azure, rehearsed before cutover.

Landing zone, Azure Migrate and day-one controls, delivered end to end.